Guide: Software project – realistically plan and control costs

The costs of a software project consist of significantly more than just the actual development. Anyone planning a software project should therefore clarify early on which solution will economically meet the requirements throughout the entire lifecycle. In addition to the initial investment, internal resources, interfaces, data migration, operation, and subsequent further development also play a crucial role.

What costs are incurred in a software project?

Analysis and concept development form the initial foundation. This is followed by architecture and design, development, interfaces, testing, data migration, implementation, and project management. Integrations with existing ERP, CRM, or specialized systems, in particular, can significantly impact the overall effort.

Internal resources are also required. Subject matter experts must explain processes, review data, make decisions, test functions, and conduct acceptance procedures. These resources should be planned for in the same way as external development costs.

Therefore, we have compiled a guide that shows the cost components of a professional software project and how to develop a realistic investment framework.

Standard software, hybrid or custom software?

Not every process requires individual development. Standard software It is particularly suitable for largely established processes for which suitable solutions are already available on the market.

A Hybrid approach It combines standard software with individual components. Generic processes can be covered by existing systems, while specific core processes are developed in a targeted manner.

Custom software It becomes interesting when core business processes are highly company-specific, multiple systems need to be integrated, or there are special requirements for security and regulation.

Plan your software budget for the long term

The software budget doesn't end with the go-live. Maintenance, security, hosting, support, and further development accompany a business application for many years. For typical applications, our cost model suggests approximately 15 percent of the original development costs per year as a guideline. Depending on the further development needs, this figure can be lower or higher.

Uncertainty should also be factored into the budget. If requirements and the data model are already defined in detail, a smaller reserve may suffice. However, if there are many open technical and functional questions, a significantly larger reserve is advisable.

Generative AI can accelerate individual development tasks. However, requirements, architecture, interfaces, security, and quality assurance remain essential. Therefore, a sound software budget always considers the total costs over the planned lifecycle.